Past Featured Projects

2013

 plusb

PLUS BERHAD

                                                                                                                          
  1. Routine and corrective maintenance of the toll systems and equipment for Projek Lebuhraya Utara-Selatan  (PLUS) at Section C3 (Sg. Buloh to Tg. Malim).


 plusb

TERAS TEKNOLOGI SDN BHD

                                                                                       
  1. To rectify and repaired damage fiber optic cable for VMS KM7.0 NB Shah Alam that cause by drainage  construction at KM8.2 NB.

  2. To supply and delivery to site Cisco Catalyst 3750X Gigabit Ethernet Switch. Integration with existing Cisco  Gigabit Ethernet Network System and Management of Network System (NMS).

  3. Design, supply, delivery to site, installation, testing and commissioning of Vehicle Registration Number System  for Juru to Skudai Stretch – Subcontract works for installation, testing and commissioning of fiber optic network  upgrading at selected PLUS toll plaza.

  4. Networking upgrading works to fibre optic at Bukit Beruntung toll plaza.

  5. To supply, install and test the Alarm Triggering System.


 plusb

PROPEL BERHAD

                                                                                                                     
  1. Supply, delivery, testing and commissioning of telecommunication and networking equipment for the Proposed  Bukit Gambir Interchange (cabling work, Catalyst 3750E & PABX system).

  2. To supply, delivery to site, installation, upgrading, integration, testing and commissioning of UTP Cat6 network  cabling infrastructure and PABX connectivity between PBSB and PLUS.

  3. To supply, delivery to site, installation, testing and commissioning of Security Alarm System at selected toll  plazas (SP6000 malfunction due to lightning strike).

  4. To deliver, install Toll Collection System (TCS) and VRN System at selected PLUS toll plazas at section C3 and C4  (Lembah Beringin-Bukit Raja).

  5. To deliver, install Toll Collection System and VRN System at Portable Toll Booth & Semi Staggered Toll Booth at  selected plus toll plazas.

  6. To supply, delivery to site, installation, testing and commissioning of Security Alarm System at selected toll  plazas throughout NSE.

  7. Rectification work of video encoder PTZ faulty at KM41.40 SB KLIA due to lightning strike.

  8. Rectification work of CCTV mainline PTZ camera at Dengkil RSA SB due to lightning strike.

  9. To supply, install and test the Alarm Triggering System at Penang Bridge toll plazas.

  10. Supply PTZ camera mainline (CO3) no image at TMC due to lightning strike.

  11. Rectification work of VMS KM9.9NB due to lightning strike.

  12. Supply and deliver spare parts for fibre converter.

  13. Rectification of rectifier.

2012

 plusb

PLUS BERHAD

                                                                                                                          
  1. Routine and corrective maintenance of the toll systems and equipment for Projek Lebuhraya Utara-Selatan  (PLUS) at Section C3 (Sg. Buloh to Tg. Malim).


 plusb

PROPEL BERHAD

                                                                                                                     
  1. To supply spare parts for Intelligent Traffic System.


 plusb

TERAS TEKNOLOGI SDN BHD

                                                                                      
  1. To supply, delivery to site, installation, testing and commissioning of UTP CAT6 cabling infrastructure and  related network switch for Gigabit Ethernet network system at PLUS, ELITE and LINKEDUA toll plazas.

  2. To install standalone terminal and Intercom at SGB, HSB and BTR toll plaza.


 plusb

TURBINE TECHNIQUE SDN BHD

                                                                              
  1. The design, supply, delivery to site, installation, testing and commissioning of network connectivity and PABX integration systems  upgrade between BKE and PLUS.

  2. To supply, install, testing and commissioning of PABX telephone extension and reconfigure and configure Catalyst 3750E at Lunas  TP and Kubang Semang TP.

  3. To supply and deliver Cisco WS-C2960-24TTL.

2011

 plusb

PLUS BERHAD

                                                                                                                          
  1. Routine and corrective maintenance of the toll systems and equipment for Projek Lebuhraya Utara-Selatan (PLUS) at Section C3  (Sg. Buloh to Tg. Malim).


 plusb

PROPEL BERHAD

                                                                                                                       
  1. To supply and deliver VMS power supply module, 12V 500W, VMS pictogram board, VMS controller board & VMS terminal  server (MOXA DE-311).

  2. To design, supply, delivery to site, installation, testing and commissioning of security alarm system at PLUS expressway.


 plusb

TERAS TEKNOLOGI SDN BHD

                                                                                      
  1. To supply, delivery to site, installation, testing and commissioning of CCTV and CISCO Gigabit Ethernet switch at selected rest and  service areas (RSA) along the PLUS expressway.

  2. Installation of toll equipment at SGB, RAW & RWS toll plazas.


 plusb

TURBINE TECHNIQUE SDN BHD

                                                                                
  1. To supply, install, testing and commissioning of CCTV and Cisco Gigabit Ethernet switch at Sg.Perak RSA SB.


 plusb

TOUCH MINDSCAPE SDN BHD

                                                                                      
  1. To supply and deliver of splicing machine and OTDR.


 plusb

BASTION SOLUTION SDN BHD

                                                                                    
  1. To supply and deliver CISCO switches at UiTM.

2010

 plusb

PLUS BERHAD

                                                                                                                          
  1. Routine and corrective maintenance of the toll systems and equipment for Projek Lebuhraya Utara-Selatan (PLUS) at Section C3  (Sg. Buloh to Tg. Malim).

  2. To supply and testing CAT 6 and telephone cable at Yong Peng.


 plusb

PROPEL BERHAD

                                                                                                                      
  1. To supply and deliver CISCO router and Bridge Modem G-SHSDL V.35.

  2. To supply additional work for CISCO Gigabit Ethernet network.

  3. To supply and deliver CISCO switches.


 plusb

TERAS TEKNOLOGI SDN BHD

                                                                                      
  1. To install, delivery, testing and commissioning of OB & Passage Loop Detection - BKB (MO1 & MO2) C3.


 plusb

TURBINE TECHNIQUE SDN BHD

                                                                               
  1. To supply, install, testing and commissioning for backbone PTZ camera at Linkedua.

2009

 plusb

PLUS BERHAD

                                                                                                                          
  1. Routine and corrective maintenance of the toll systems and equipment for Projek Lebuhraya Utara-Selatan (PLUS) at Section C3  (Sg. Buloh to Tg. Malim).


 plusb

TURBINE TECHNIQUE SDN BHD

                                                                              
  1. To supply, install and integration with existing Cisco Gigabit Ethernet network system and management of network system (NMS), testing and commissioning.


 plusb

KEMENTERIAN KESIHATAN MALAYSIA

                                                             
  1. Telephone network services for office at level 4-6, bangunan plot 3C4, Presint 3 Putrajaya (IP PABX System phase III).


 plusb

UNIVERSITI MALAYA

                                                                                                          
  1. To supply "Drag Coefficient Experimental Setup" for faculty of chemical engineering.


 plusb

UNIVERSITI MALAYSIA PAHANG

                                                                            
  1. To supply, delivery, installation, testing and commissioning of manual gearbox test apparatus for automative laboratory of mechanical engineering laborataory, fakulti kejuruteraan mekanikal.

  2. To supply, delivery, installation, testing and commissioning of laboratory two roll mill , fakulti kejuruteraan kimia & sumber asli.

  3. To supply, delivery, installation, testing and commissioning of hot and colding press, fakulti kejuruteraan kimia & sumber asli.


 plusb

PROPEL BERHAD

                                                                                                                      
  1. To design, supply, delivery to site, installation, integration, testing and commissioning of CISCO Gigabit Ethernet network system upgrade at PLUS, Elite, Linkedua and BKE (supply and deliver IP telephone Converter for the upgrade of PABX Network System and Upgrading Cisco Networking Monitoring System).

  2. To design, manufacture, supply,delivery to site, installation, testing and commissioning of PLUS traffic monitoring centre (integration of network systems).

  3. To supply and deliver CISCO equipment (CISCO Gigabit Ethernet networks system upgrade at PLUS, ELITE, LINK2 and BKE).

  4. To design, supply and install Nokia V.35.

  5. Wide area network for PLUS highway.

2008

 plusb

PLUS BERHAD

                                                                                                                          
  1. Routine and corrective maintenance of the toll systems and equipment for Projek Lebuhraya Utara-Selatan (PLUS) at Section C3  (Sg. Buloh to Tg. Malim).


 plusb

PROPEL BERHAD

                                                                                                                      
  1. To design, manufacture,supply,delivery to site, installation,testing and commissioning of PLUS traffic monitoring centre (integration of network system).

  2. To supply and install of Spares for PROPEL wide area network (WAN).

  3. To supply of Cisco switch 3750E.


 plusb

TERAS TEKNOLOGI SDN BHD

                                                                                       
  1. Relocation of the existing communication system at Johor Baharu causeway to Gerbang Selatan toll plaza.

  2. To supply CCTV equipment.


 plusb

MTD GROUP

                                                                                                                                  
  1. Cash Transfer System for toll system.

  2. Pneumatic Air Tube System.


 plusb

ISWARABINA SDN BHD

                                                                                                  
  1. To supply, deliver, install, test, approval and commissioning of transmission system for the proposed design, build, testing, commissioning and maintenance of Putra Heights interchange and toll plaza at KM 13.2 North South Central Link Expressway For Sime UEP Heights Sdn Bhd.


 plusb

PERSPEC PRIME SDN BHD

                                                                                            
  1. To supply and install PABX MD 110 version 9.0 ELU card for Saujana Putra toll plaza.


 plusb

UNIVERSITI MALAYA

                                                                                                         
  1. To supply, delivery, installation and commissioning of gas diffusion apparatus.